Wednesday, August 14, 2013

Mk V Pipe

A few days ago I thought about an easier-to-build version of the Mk III Pipe. The solution I came up with was the Mk V Pipe. It can be built much quicker because of its thinner tip.


Friday, August 2, 2013

Excalibur 2

It has been quite a while since my last post.

Although the Excalibur still performs well, there are some details that might be improved. What I dislike the most about it is the fact that the nozzle and the barrel are hold together by the heater block. As the heater block consists of aluminium the thread will get damaged on the long run that way.

So I decided to develop the Excalibur 2.